The Kenya Urban Roads Authority (KURA) announced that a 100‑metre segment of Gitanga Road in Kawangware, between Km 0+520 and Km 0+620, will be partially closed for ten days, beginning at 6 am on Thursday 26 November and ending at 6 pm on Saturday 5 December, both dates inclusive.

The closure is intended to enable safe construction of a cross culvert that will improve drainage along the corridor, a measure aimed at reducing flooding during the peak short‑rains season.

Motorists are advised to use Macharia Road as a diversion when travelling toward Kawangware, while traffic bound for Nairobi or requiring local access should be routed via Naivasha Road for the duration of the works.

Heavy vehicles and public service vehicles exceeding 7.5 tonnes are specifically directed to use Naivasha Road throughout the closure period.

A pedestrian walkway will remain open, and traffic marshals will be positioned at barricades to guide drivers and ensure orderly flow at the diversion points.

Gitanga Road is a busy commuter route, especially during weekday rush hours near Valley Arcade and Lavington, serving residents of Kawangware, Riruta and Kabiria who travel to Lavington, Kilimani and Westlands.